2025-04-09 - Luoyang Spring 2025 - reconstruction by Stewy
B' U' D' R' U' L F D L2 U' F2 R2 U' L2 B2 U' B2 D L U'
y2 // inspection
R D' L F U' R U R R U R' u' // xxcross
U2 R U' U' R2' F R // 3rd pair
U' F' // 4th pair
U U F' L F L' U' L' U L // EO
U U' L U L' U L U2' L2' U R U' L U R' // ZBLL
view at
alg.cubing.net
|
Total |
F2L |
LL |
Cross+1 |
OLS |
PLL |
| Time |
4.49 |
2.17 |
2.32 |
1.47 |
1.03 |
1.46 |
| Split |
100% |
48.3% |
51.7% |
32.7% |
22.9% |
32.5% |
| STM |
46 |
21 |
25 |
12 |
12 |
15 |
| STPS |
10.24 |
9.68 |
10.78 |
8.16 |
11.65 |
10.27 |
| ETM |
46 |
21 |
25 |
12 |
12 |
15 |
| ETPS |
10.24 |
9.68 |
10.78 |
8.16 |
11.65 |
10.27 |
other solves in this average:
= 4.95 average of 5