2024-09-08 - Warm Up at gateway klia2 2024 - reconstruction by Stewy
D2 F2 R2 D2 R2 F U2 L2 B2 D' L U2 B R' U' B R' B2 F'
x z2 // inspection
D' r U' R U R U D' L U L D // xxcross
F' U2' F // 3rd pair
U2' L' U' L // 4th pair
U' L' U' L U' L' U2 L // OLL
U' x R2' D2 R U R' D2 R U' R // PLL
view at
alg.cubing.net
|
Total |
F2L |
LL |
Cross+1 |
OLS |
PLL |
| Time |
3.73 |
2.05 |
1.68 |
1.35 |
1.03 |
0.96 |
| Split |
100% |
55.0% |
45.0% |
36.2% |
27.6% |
25.7% |
| STM |
37 |
19 |
18 |
12 |
12 |
10 |
| STPS |
9.92 |
9.27 |
10.71 |
8.89 |
11.65 |
10.42 |
| ETM |
38 |
19 |
19 |
12 |
12 |
11 |
| ETPS |
10.19 |
9.27 |
11.31 |
8.89 |
11.65 |
11.46 |
other solves in this average:
= 4.85 average of 5